Free for project managers and superintendents

The Job Start Kit

The handoff meeting agenda and the 3-week lookahead from No Direction, No Work, with the editable files.

Two of the routines we use to start a commercial job right. Run the handoff from estimating to operations on one page, then turn the schedule into weekly commitments from every trade. Print them, or open the Word and Excel files and make them yours.

Free. No payment needed. Enter your first name and email to get the download.

Cover of The Job Start Kit, a free sample for project managers and superintendents. Charcoal cover with a 3-week lookahead schedule grid and yellow bars.

Who it is for

Project Managers and Superintendents Starting a Job

You just won a job, or you are about to run one, and you want a better start than a file transfer and a hope. This kit gives you the first two routines to put on a real job.

Start here

The estimate isn't the plan until operations owns it.

We hold the handoff meeting within 24 hours of award, and nobody leaves that room without owners and dates.

What is in the kit

A Handoff Routine and a Weekly Routine, Ready to Use

Two pieces of the book, written to use on your next job, plus the editable files.

  • 1A short note from Jeff on why the handoff and the weekly routine come first
  • 2The handoff chapter from the book: the 12 items we cover in every handoff meeting, and the dates you leave with
  • 3The one-page Handoff Meeting Agenda to print, plus the editable Word version
  • 4The 3-week lookahead chapter: who owns it, when it goes out, and the five-step weekly sub meeting agenda
  • 5The editable 3-week lookahead in Excel, with step-by-step instructions
  • 6A "Do this Monday" list for running the weekly sub meeting

Look inside

Pages From the Kit

These are pages from the PDF. Select one to see it full size.

  • Opening page of the handoff chapter from No Direction, No Work, with the handoff meeting and its 12 items
    The handoffFrom Chapter 2: the handoff meeting
  • The one-page Handoff Meeting Agenda in ruled job-form style, with 12 numbered sections and a dates-you-leave-with list
    The agendaThe one-page Handoff Meeting Agenda
  • Opening page of the 3-week lookahead chapter, with the weekly sub meeting agenda
    The lookaheadFrom Chapter 7: lookaheads and the weekly sub meeting
  • Instructions page for the editable 3-Week Lookahead Excel file, with a screenshot of the file and step-by-step directions
    The editable fileHow to use the lookahead file

What you download

Three Files: Read It, Print It, Edit It

The Kit, PDF

Read it on a phone, tablet or laptop, and print the agenda for your next handoff meeting.

The Agenda, Word

The editable Handoff Meeting Agenda. Put your company name on it and keep a copy in your project template folder.

The Lookahead, Excel

The editable 3-Week Lookahead. Enter the Monday of week 1 and the dates in all three weeks fill in on their own.

Before you rely on it

Read This Before You Use It

Check your contract and your state's rules. The kit is general information for construction professionals, not legal, accounting, insurance, tax or safety-compliance advice. The time frames in it, such as 24 hours and 48 hours, are our internal targets, not legal requirements. Have your attorney review any form before you rely on it.

About the author

Jeff Newland

Jeff Newland has spent 25 years in construction. In 2023 he founded Bold Commercial Construction, a general contractor based in Longview, Texas, that builds commercial projects in several states.

Bold Commercial Construction builds commercial projects, including dental offices, a retail market building and structural steel commercial buildings.

Also free

No License, No Work

A Commercial GC's Guide to NASCLA and Getting Licensed in Multiple States. A free guide for contractors who are about to build in a state where they are not licensed yet.

Get the Free Licensing Guide

Cover of No License, No Work, the free guide to NASCLA and getting licensed in multiple states. Charcoal cover with a map of the United States and yellow pins.

The book behind the kit

The Rest of the System

No Direction, No Work is the handoff-to-closeout playbook for the project managers and superintendents who run the job. The kit is two pieces of it.

The playbook is $79 as a PDF, $397 with the editable Template Pack and $897 with the pack and a one-hour setup review call. Checkout opens soon.

See the Playbook, $79 See all prices

Cover of No Direction, No Work, the playbook for project managers and superintendents. Charcoal cover with a yellow job alignment plan road running from handoff to closeout.